Welcome, agent
You're viewing a public preview of this project. Sign up free to unlock unit availability, commissions, and contact the developer team.
Dubai projectsBusiness Bay, DubaiMISMAK "Clover Bay Tower"
◆ Mismak Properties·Project · Ref 7980

MISMAK "Clover Bay Tower"

Business Bay, Dubai·Q4 2011
Unit price
RangePresale (EOI)12M – 12MAED
Property type
Off-planApartment
Location
Handover
Q4 2011Planned
About the project

MISMAK "Clover Bay Tower"

Clover Bay Tower is a commercial building from the developer Mismak Properties in the prestigious Business Bay area.

The building consists of three podium parking levels, a functional ground floor with amenities and twenty‑five office floors.

The architectural appearance of the tower is characterized by modern minimalism: the strict lines of the facade are complemented by panoramic glazing, which visually facilitates the massive structure and fills the interior spaces with natural light.

The interior spaces are designed with an emphasis on functionality and comfort: the offices are offered both in a free layout and with finished finishes.

The finishing includes high-quality materials: laminate or tile in common areas, modern lighting systems and integrated communications.

Residents and staff have access to a range of amenities: three‑level covered parking, high-speed elevators, 24-hour video surveillance and security, a fitness center on the ground floor, pharmacies, and cafes.

The complex is located on Marasi Drive, a short drive from key points in Dubai: Dubai Mall and Burj Khalifa are about 7 minutes away by car, Sheikh Zayed Road is 5 minutes away, and Dubai International Airport is about 17 minutes away. Dubai Water Channel and Business Bay Walk walking areas are also nearby.

HandoverQ4 2011
Project updates

News on MISMAK "Clover Bay Tower"

0 updates
No updates yet — be the first to follow this project.
Become a Insiders agent

Earn up to 80% of brokerage on Dubai's best projects

Free to join · No fees · Live availability across 200+ projects · Payouts in 7 days

Message us